/ District Heating /

Efficient and sustainable projects and facilities customized for the administration and district heating sector. At CER we understand the complexity of these projects and know perfectly the details of such installations. The quality and confidence we provide to our clients arises from a great experience in the administration and district heating sector and from the highest quality of our products. Endorsed by HERZ and Binder, at CER we are able to find the installation that best suits the needs of our clients. CER offers energy solutions suitable for each type of project within the administration and district heating sector.


Outstanding projects within the biomass boilers sector for the administration and district heating

  • Heat network in Sant Pere de Torelló

    Installation of a Binder biomass boiler that will provide heating and energy efficiency to the entire urban area. 
    The company SURIS S.L. has proceeded to launch the 4MW BINDER boiler that will allow to increase energy efficiency and expand the supply network by 20% in the urban center of Sant Pere de Torelló. The municipality of Sant Pere de Torelló was one of the first places in Spain where a district heating facility was performed more than 30 years ago. As a pioneering bioenergy village, it has already renovated its facilities for energy supply with the BINDER RRK4000 biomass boiler. In Sant Pere de Torelló and its surroundings, there is an important industry, a wood industry that generates abundant waste. With the new boiler they will use forest biomass that comes from a maximum of 50 km from the municipality to try to achieve maximum energy efficiency.

    Boiler model: Binder RRK 4000
    Power: 4,000 kW
    Fuel: Local forest chips
    Sector: Residential - Detached and isolated households
    Year of installation: 2018
    Municipality / Province: Sant Pere de Torelló / Barcelona

  • Biomass network for thermal use in the Recinto de Presidencia, Castilla y León

    REBI carries out a new implementation of HERZ boilers in the Presidencia de la Junta de Castilla y León in Valladolid. The facility has three HERZ firematic 500 kW boilers, and a total power of 1,500 kW to supply eight buildings of the institutional complex. The new heat network is an opportunity to improve cities like Valladolid to also be responsible for compliance with the reduction of CO₂ emissions required by the European directive 2018/844 and for the implementation of a sustainable energy model for energy efficiency.

    The project has been carried out by the company Termosun.

    Boiler model: 3 Firematic 500 kW
    Power: 1,500 kW
    Fuel: Pellets
    Sector: Administration and district heating sector
    Year of installation: 2018
    Municipality / Province: Valladolid
  • Installation of a heat network in Cantalejo

    District Heating to provide domestic hot water and heating services to 9 buildings in the town of Cantalejo. Installation of a Binder RRK1000 boiler, which provides 1,200 kW of thermal power connected to a buffer tank with a capacity of 30,000 liters, to supply domestic hot water and heating to various buildings in the town of Cantalejo, Segovia. The project consists of the construction of a production plant and heating network that provides service to nine buildings, which are: the Pinar nursing home, the house of the Hermanos de San Juan de Dios, the heated municipal swimming pool, the Instituto de Educación Secundaria “Hoces del Duratón”, the Sol street sports center, the Colegio de Educación Infantil y Primaria “Los Arenales”, the Civil Guard Barracks, the "JoseRodao" cultural center and the municipal sports hall. With this action, Cantalejo's commitment to renewable energy is evident.

    The project has been carried out by the company Termosun.

    Boiler model: 1 Binder RRK 1,000 of 1,200 kW
    Power: 1,200 kW
    Fuel: Chips
    Power supply system: Rotary system
    Sector: Residential – District heating 
    Year of installation: 2017
    Municipality / Province: Cantalejo / Segovia

  • Biomass heat network in Bergedans

    Biomass to supply domestic hot water and heating in Bergedans.
    Installation of 13 boilers with power capacity from 45 kW to 1,000 kW to supply DHW and heating to 32 buildings in 6 towns in the region of Berguedà, Bagà Saldes, Gòsol, Cercs, La Pobla de Lillet and Berga (Catalunya).
    The Mancomunitat dels Berguedans project has a total of 4,500 kW installed, which comes from 7 installations and 7 heat networks with a total of 5 km of pipelines.
    The foreseen consumption of biomass is 1,200 t / year of forest chips, coming from the forests in the cities that are part of this project.

    Work done by company Urbaser.

    Boiler model: 13 boilers with power capacity from 45 kW to 1,000 kW
    Power: 4,500 kW
    Fuel: Chips
    Power supply system: Rotary system
    Sector: Educational and cultural centers 
    Year of installation: 2017
    Municipality / Province: Shire bergued / Barcelona