Biomass at the Piscina Colonia Sant Jordi

Sustainable facility in the Piscina Colonia Sant Jordi training center. A reference facility in the world of swimming, as it is the high-performance training center for all the greatest swimmers and swimming teams in the world. First boiler was installed in 2009 with the intention to prolong the training season. Given its great acceptance and demand for space to train, in January 2015 a second boiler was installed to provide continuous service throughout the year. First installation uses pellets as a fuel while second one uses chips. They provide air conditioning of the outdoor Olympic swimming pools as well as the changing rooms and hot water production. The project has been carried out by the company Termosun.

Boiler model: Two Biomatic 400 kW boilers
Power: 800 kW
Fuel: Pellets and chips
Sector: Sports sector
Year of installation: 2009
Municipality / Province: Ses Salines / Palma de Mallorca


Installation of a biomass boiler at the Atletic Terrassa Hockey Club

Terrassa Hockey Club, a multi-sport club in Terrassa that invests in renewable energy. “It’s one of the club investments I’m most proud of, it has really been very beneficial.” Jordi Castelló, Manager of the Atlétic Terrassa Hockey Club. Athletic Terrassa Hockey Club, with more than 60 years of history, is a multi-sport club, located on the Carretera de Castellar de Terrassa (Barcelona). The facility has an energy need of 700 MWh/year 100% covered. Economic savings of approximately 40% to 50% per year.
Work done by company Energrup.

Boiler model: A 500 kW Biomatic boiler
Power: 500 kW
Fuel: Chips
Sector: Sports sector
Year of installation: 2012
Municipality / Province: Castellar del Valles / Barcelona


Air conditioning of swimming pools with biomass in Pedrera

Installation of a HERZ biomass boiler in La Piscina de Pedrera. Installation of HERZ firematic boiler fed with pellets or bones of the olives. Air conditioning of the premises as well as swimming pool water heating and generation of domestic hot water for the changing rooms. Boiler fed through rigid auger, which allows both pellet and bones of the olives feeding.
The project has been carried out by the company Termosun.

Boiler model: 1 firematic of 400kW
Power: 400 kW
Fuel: Pellets or bones of the olives
Sector: Sports sector- swimming pools
Year of installation: 2016
Municipality / Province: Pedrera / Sevilla